Published: 16. 10. 2026 - 12:00 Limited space around column bases and existing building services calls for careful coordination. For the reconstruction of Hotel Marjan in Split, Kampmann Katherm HK trench fan coils are being supplied with project-specific adaptations.

Equipment coordinated with the building
In the project designed by Studio 3LHD, trench units allow heating and cooling to be integrated beside glazed areas while preserving usable interior space. Some units and floor trenches use special dimensions developed from the project drawings.
A complete four-pipe solution
TDC supplies four-pipe Katherm HK units with black anodised aluminium grilles, suitable valve equipment, condensate pumps and KaControl with KNX integration. The selected arrangement must coordinate the water connections, electrical supply, drainage and maintenance access.
From the drawing to the installation
Site-specific geometry needs to be checked before equipment is ordered. Available floor space, column positions and services can influence the trench layout and connection arrangement. Technical coordination with the manufacturer helps align the selected equipment with these constraints.
Installation is in progress. This reference describes TDC’s equipment supply; it does not imply that TDC carries out the complete building design or construction.